Stock Code
834404
Hotline:400-8586-111
LOCATION:  Home > Solution > Hydraulic > Case Study

<< Case Study

Guangdong West Niu hydropower station Xie Hongzha

The system employs Schneider PLC to communicate via remote interfaces. Field operation can be realized, or remote operation can be carried out in the central control room.

Related Products
No Data